Project Case Study
Corporate Headquarters & Urban Campus
Campus as City
Forum One rejects the corporate campus archetype. Instead of an isolated compound, the project weaves itself into the surrounding urban fabric — streets pass through it, markets occupy its lower levels, and its roofscape is a public park.
Bioclimatic Engineering
The building's orientation, shading fins, and cross-ventilation system were modelled over 18 months using computational fluid dynamics — reducing mechanical cooling loads by 44% against code baseline.
— BIM Coordination & Performance
Technical Core
Project No. 22-04 / EB
Structural Precision System
BIM Coordination
Level 500
Cooling Reduction
44%
Green Cover
3,200 m²
GRIHA Rating
5 Star
Efficiency Report
The structure employs a monolithic core system that reduces material waste by 18% while enhancing the thermal mass performance of the interior spaces.